Kratos Towers Hinjewadi, Pune.

Overview

Project  comprising  of  Total  2  Towers  of  2Basements+14 Commercial IT Floors.

  • The  project  has  Two  Basement  Slabs  of  55,675 Sqft of Footprint area each.
  • Two Podium Slabs Having 48,534 Sqft of  Footprint area each.
  • And  12  Commercial  Floor  Slabs  having
  • Footprint of 34,053 Sqft each.
  • Thus Totalling built-up area of 6,28,723 sqft.  Including OHT & STP.
  • Total Project Work Order Value – 31.54  Cr.

Scope Awarded to Synfra

  • Membrane Waterproofing work for Basement raft  and retaining Walls
  • Backfilling Work
  • RCC Works.
  • Co-Ordination with PT agency.
  • Total project duration awarded by Client is 18  months.
  • All the Slabs are designed with Post Tensioning  Technique which reduces the number of beams  and its depth which helps in getting more clear  floor to floor height.

Major Quantities

  • Concrete – 25,920 Cum
  • Reinforcement Steel – 3394 MT
  • Waterproofing works – 12,267 Sqmt.
  • We have deployed System Formwork by Peri for Vertical  Structures
  • This reduces the installation time and reduces the deployment of additional material, also increase the quality of the structure.